Following a Solar Installation From Enquiry to Handover
A rooftop solar job involves an enquiry, a site survey, a quotation, paperwork, approvals, material, installation and inspection. Delays rarely come from the installation itself. They come from a file waiting on a signature that nobody remembered to chase.
Record each job against a fixed set of stages and the date it entered each one. A list sorted by how long jobs have been waiting is often more useful than any chart, because it tells the office whom to call today.
Capture survey details in a structured form with photographs: roof type, shading, load and cable route. The person preparing the quotation should not need a second visit to answer a basic question.
Keep the customer informed at each stage. A short message saying what has happened and what comes next reduces follow up calls and builds trust. After handover, the same record holds warranty and service history, which makes maintenance visits much easier to plan.